The Bumpa hoist is quick to erect – up and running in under 4 minutes. Loads tiles, fittings, felt bricks, blocks, mortar, etc. Faster than any other competitor. Continuous action, no waiting for platforms to be loaded/unloaded. Easily moved, re-positioned in seconds. Easily maneuvered by 2 men even on difficult sites.
- 110v
- 8MTR
- 3KW
For more lifting equipment Click Here
For operation instructions Click Here